The project located at White Bay Berth No 5 consisted of the demolition of various buildings and construction of a new cruise terminal. Works involved the temporary diversion of the private HV network & eventual disconnection. Removal of redundant HV Transformers and associated switchgear, installation of new Electrical services, Communications Infrastructure, Security & Access Control Systems & Fire Detection Systems.
There was also the integration of all power and communications services to the 2 new Gangways which were shipped in from Spain to tie into the main terminal building.
Barnwell Cambridge was engaged under a Design and Construct Contract based on 50% concept scope from an electrical consultant to provide the following:
- New Sub Mains
- New Main Switchboards and Distribution Boards
- Supplies to:
-
-
- Lifts,
- Escalators,
- Mechanical boards
- New Gangways to Ships
-
- General Power and lighting (Internal / External)
- Monitored Emergency escape lighting and exit signage
- Lighting Control System
- Final sub circuits, outlets and accessories
- UPS Systems
- Communications Network Cabling
- CCTV Installation
- Security Installation